Shop by build stage
A build goes in stages, and so does buying for it. Pick a stage to see the materials that go into it, the plant and services to hire, and the calculators that size it. Save a whole stage to a project list, add quantities as the drawings firm up, then order the priced lines or send the lot for a quote.
Stage 1 of 8
Site prep & earthworks
Bulk earthworks first: fill to level the site, then compacted layers to build on — and a pioneer layer where the ground is soft.
Selected fill & subgrade
G10 Selected Fill / Subgrade Material
R212.40 / ton
Sub-base layer
G7 Natural Gravel (Sub-base)
R212.40 / ton
Selected layer
G5 Natural Gravel
R212.40 / ton
Pioneer layer on soft ground
Dump Rock / Selected Pioneer Layer
R400.00 / ton
Recycled fill
Recycled Crushed Concrete Aggregate (RCA)
R103.50 / ton
Filling sand
Filling Sand
R358.40 / ton