A Besbpo Group company

Corporate website(aggregated.besbpo.co.za, opens in a new tab)
AGGREGATED
AGGREGATES

Haulage · rubble · skips · clearing

Site Services

Move material, clear a site or get rid of rubble — handled by vetted partners, with rubble and waste taken to licensed sites. Every service is quoted until our partners' written rates are in place.

Quote · per load

Tipper Haulage — 6m³ Load

Per tipper load. Move aggregates, soil or spoil between points; cart pricing inside the delivery distance bands, quote beyond.

Request this service →
Quote · per load

Tipper Haulage — 10m³ Load

Per tipper load, larger trucks for bulk material.

Request this service →
Quote · per day

Tipper with Driver — Per Day

Tipper truck with driver and fuel for the day, for repeated runs.

Request this service →
Quote · per load

Rubble Removal — 6m³ Load

Per tipper load of clean rubble; licensed disposal and weighbridge slip included. Mixed or hazardous waste is quoted or declined.

Request this service →
Quote · per load

Rubble Removal — 10m³ Load

Per tipper load of clean rubble, larger trucks; licensed disposal and weighbridge slip included.

Request this service →
Quote · per skip

Skip Bin — 6m³

Per skip: hire period plus one collection; size and rate to be confirmed with partners.

Request this service →
Quote · per skip

Skip Bin — 12m³

Per skip: hire period plus one collection; size and rate to be confirmed with partners.

Request this service →
Quote · per m²

Site Clearing

Per m² by vegetation density, from photos and a rough area; partner site visit for larger areas. Quote at launch.

Request this service →
Always quoted

Demolition

Always quoted per job and subcontracted to vetted partners; competent person and method statement required. Asbestos excluded at launch.

Request this service →
Always quoted

Waste Management (Scheduled)

Scheduled collection contracts, quoted after a site audit.

Request this service →
Quote · per tonne fixed

Steel Fixing (Labour)

Fixing reinforcement on site to the engineer's drawings and bar bending schedule: placing and tying rebar and mesh, chairs and spacers for cover, laps and starter bars, ready for the engineer's inspection before the pour. Labour by vetted steel-fixing partners, priced per tonne fixed; the steel itself is ordered separately (stock lengths, mesh, or cut & bend).

Request this service →
  1. 01

    Tell us the job

    Machine or service, province, site and dates. It takes a couple of minutes.

  2. 02

    Accept a written quote

    Priced from a vetted partner's written quote. Accept it in your account — nothing is booked until you pay.

  3. 03

    Pay, and we confirm a partner

    Pay by EFT. The job then goes to vetted partners near you, and we name the one who accepts.

  4. 04

    Start with your code, pay on sign-off

    The crew starts with your arrival code. The partner is paid only after you sign off, with 48 hours to raise a problem.

More from the platform