Pick the job and enter its size. We'll work out the volume, an approximate weight and how many truck loads it takes, and suggest the job pack that covers it. For a single material, the calculator on each product page uses that material's own density.

Rubble out, recycled fill in.

Your estimate

Volume
13.8 m³
Approx. weight
22.1 t
Truck loads
2

Assumptions: 15% compaction allowance, 1.6 t/m³ loose density, 10 m³ tipper loads. A guide only — confirm quantities with your engineer.

Suggested: Demolition to Fill

  • Demolition
  • Rubble haulage — 10m³ loads
  • Recycled crushed concrete back to site
See the pack →

Send this estimate for a quote

We'll check the quantities, price the materials and match the plant — one written quote.