Bellwether Architecture & Engineering · Compliance
Energy (SANS 10400-XA) design
The energy-efficiency calculations and specification council needs for a new building or extension — glazing, insulation and hot water.
- Fee
- Quoted per project
- Basis
- Priced from your brief: size, site and what council needs.
- Confirmed
- On BAE's written proposal and terms of engagement — nothing is charged until you accept.
- Signed by
- The registered architect or engineer allocated to your project, named with their SACAP or ECSA registration on the proposal.
What you get
- Rational XA calculation or deemed-to-satisfy schedule
- Insulation and glazing specification
When you need it
- Every new building and extension that heats or cools a space
From design to site
Send a brief
BAE replies with questions or a fee proposal. Reply to the confirmation email with any drawings, title deed or photos.