Bellwether Architecture & Engineering · Quantities
Bill of quantities
A measured bill of every material and trade from your drawings — and the materials loaded as a project list on this store, ready to price and order stage by stage.
- Fee
- 1–1.5% of building cost, minimum R8,500, excl. VAT
- Basis
- A share of the estimated cost of the building work — a budget figure until the proposal.
- Confirmed
- On BAE's written proposal and terms of engagement — nothing is charged until you accept.
- Signed by
- The registered architect or engineer allocated to your project, named with their SACAP or ECSA registration on the proposal.
What you get
- Measured bill of quantities
- Materials as a project list in your account, by build stage
When you need it
- Pricing a build before you commit
- Comparing builders' quotes like for like
Budget it with the design fee estimator.
From design to site
Send a brief
BAE replies with questions or a fee proposal. Reply to the confirmation email with any drawings, title deed or photos.